<?xml version="1.0" encoding="UTF-8" standalone="yes"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
    <responseDate>2026-05-18T00:55:39.851Z</responseDate>
    <request verb="GetRecord" identifier="ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai:2:8257" metadataPrefix="dim">http://ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai</request>
    <GetRecord>
        <record>
            <header>
                <identifier>ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai:2:8257</identifier>
                <datestamp>2024-01-25T13:33:03Z</datestamp>
                <setSpec>2</setSpec>
            </header>
            <metadata>
                <dim:dim>
                    <dim:field mdschema="dc" element="title" lang="en">LEDIB Cluster House Establishing Project Management through MS Project Software Application</dim:field>
                    <dim:field mdschema="dc" element="date" qualifier="issued">2012</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="uri">http://ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai/record/2/8257</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="uri">https://www.researchgate.net/publication/374440953_LEDIB_Cluster_House_Establishing_Project_Management_through_MS_Project_Software_Application</dim:field>
                    <dim:field mdschema="dc" element="contributor" qualifier="author" authority="orcid::0000-0002-4434-9576" confidence="-1">D. Milojković</dim:field>
                    <dim:field mdschema="dc" element="contributor" qualifier="author" authority="id:44186" confidence="-1">N. Stanisavljević</dim:field>
                    <dim:field mdschema="dc" element="contributor" qualifier="author" authority="id:44187" confidence="-1">M. Jovanović</dim:field>
                    <dim:field mdschema="dc" element="contributor" qualifier="author" authority="id:44188" confidence="-1">N. Stojković</dim:field>
                    <dim:field mdschema="dc" element="description" qualifier="abstract">The Establishment of LEDIB Cluster House Project is a business development project consisting of the small-scale construction works, interior design and staff recruitment. The project management was enabled through application of the basic concept implemented in 6 stages: Project Objective and Description; Identification of the Project Manager and Team; Project Implementation Timeline Planning; Identification of the Required Resources and Finances; Implementation Monitoring and Necessary Interventions and Project Closeout. The basic objective of the Project is the closeout (completion) in the shortest period of time and with the lowest expenses. Planning, monitoring and control of the project implementation rely on the software support of the Microsoft Project – the standard program for project management.</dim:field>
                    <dim:field mdschema="dc" element="type">article</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="issue">15</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="spage">83</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="epage">93</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="issn">1451-8341</dim:field>
                    <dim:field mdschema="dc" element="source">Časopis Instituta za građevinarstvo i arhitekturu GAF Niš “Nauka + Praksa”</dim:field>
                </dim:dim>
            </metadata>
        </record>
    </GetRecord>
</OAI-PMH>
