<?xml version="1.0" encoding="UTF-8" standalone="yes"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
    <responseDate>2026-05-18T05:42:13.102Z</responseDate>
    <request verb="GetRecord" identifier="ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai:2:8252" metadataPrefix="dim">http://ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai</request>
    <GetRecord>
        <record>
            <header>
                <identifier>ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai:2:8252</identifier>
                <datestamp>2023-10-04T14:01:29Z</datestamp>
                <setSpec>2</setSpec>
            </header>
            <metadata>
                <dim:dim>
                    <dim:field mdschema="dc" element="title" lang="en">PROJECT MANAGEMENT CYCLE (PCM) - EXAMPLE OF  WASTEWATER TREATMENT PLANT PROJECT</dim:field>
                    <dim:field mdschema="dc" element="date" qualifier="issued">2011</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="uri">http://ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai/record/2/8252</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="uri">https://www.researchgate.net/publication/374440699_PROJECT_MANAGEMENT_CYCLE_PCM_-_EXAMPLE_OF_WASTEWATER_TREATMENT_PLANT_PROJECT</dim:field>
                    <dim:field mdschema="dc" element="contributor" qualifier="author" authority="orcid::0000-0002-4434-9576" confidence="-1">D. Milojković</dim:field>
                    <dim:field mdschema="dc" element="contributor" qualifier="author" authority="id:42814" confidence="-1">N. Stojković</dim:field>
                    <dim:field mdschema="dc" element="description" qualifier="abstract">Using of the common tools and standards for designing and managing of construction projects. From economical side, structure of the PCM model is similar to the purchasing model of  private or public sector. Analysis of  macro and micro level of the PCM model principles. Applying of the PCM on projects of public and private sector. Showing the list of  necessary documentation for the PCM process for EHCIP project - Environmental Heavy Cost Investment Program; the EU grant financed environmental project in Turkey. Integral approach of PCM and LFA/LFM.</dim:field>
                    <dim:field mdschema="dc" element="type">article</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="volume">14</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="spage">37</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="epage">40</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="issn">1451-8341</dim:field>
                    <dim:field mdschema="dc" element="source">Časopis Instituta za građevinarstvo i arhitekturu GAF Niš “Nauka + Praksa”</dim:field>
                </dim:dim>
            </metadata>
        </record>
    </GetRecord>
</OAI-PMH>
