<?xml version="1.0" encoding="UTF-8" standalone="yes"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
    <responseDate>2026-05-05T15:23:42.795Z</responseDate>
    <request verb="GetRecord" identifier="ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai:2:3244" metadataPrefix="dim">http://ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai</request>
    <GetRecord>
        <record>
            <header>
                <identifier>ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai:2:3244</identifier>
                <datestamp>2015-09-08T10:44:59Z</datestamp>
                <setSpec>2</setSpec>
            </header>
            <metadata>
                <dim:dim>
                    <dim:field mdschema="dc" element="title" lang="en">Project Scheduling Method with Time Using Mrp System–A Case Study: Construction Project in Libya</dim:field>
                    <dim:field mdschema="dc" element="date" qualifier="issued">2015</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="udc">005.81:624.04</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="uri">http://ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai/record/2/3244</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="uri">http://www.degruyter.com/view/j/sjas.2015.12.issue-1/ejae12-7815/ejae12-7815.xml</dim:field>
                    <dim:field mdschema="dc" element="contributor" qualifier="author" authority="id:10677" confidence="-1">A. Imetieg</dim:field>
                    <dim:field mdschema="dc" element="contributor" qualifier="author" authority="etfid:408" confidence="-1">M. Lutovac</dim:field>
                    <dim:field mdschema="dc" element="description" qualifier="abstract">Materials Requirements and Planning (MRP) is a system of production
planning and inventory control, which is used to manage manufacturing
processes. Most MRP systems are software-based and are used to
ensure that the materials are available for production, that the products
are available for delivery to customers, that the lowest possible material
and product level is maintained in store, as well as to plan delivery
schedules and purchasing activities. Upon completion of scheduling,
begins the process of follow-up, which includes the achievement of the
project goals in terms of quantity, quality and costs in accordance with
deadlines. MRP system was applied to project of 5000 housing units in
Solug area, which is close to Benghazi city, Libya, with the aim to provide
necessary cash flow to pay dues on time without delay to all involved
project sub-contractors and material suppliers, to ensure the smooth
flow of operations, as well as to diminish costs by reduction of temporary
storages and rented areas. There is a correlation between time and cost
of each activity. If the required time is shorter than the scheduled time
of the certain activity, it would demand more resources, which further
leads to the increase in direct costs of the given activity. Therefore, the
output of MRP is important since commands are issued through planning
in order to launch the suggested orders with the required quantities and
within the limited time period.</dim:field>
                    <dim:field mdschema="dc" element="type">article</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="doi">10.5937/EJAE12-7815</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="volume">12</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="issue">1</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="spage">58</dim:field>
                    <dim:field mdschema="dc" element="citation" qualifier="epage">66</dim:field>
                    <dim:field mdschema="dc" element="identifier" qualifier="issn">2406-2588</dim:field>
                    <dim:field mdschema="dc" element="source">The European Journal of Applied Economics</dim:field>
                </dim:dim>
            </metadata>
        </record>
    </GetRecord>
</OAI-PMH>